Pool Demolition

CEI Boston has the resources to plan and execute the demolition of any pool, in any location with safety and precision. We will complete the project on time and on budget. We remove pool walls, pool slabs, and pool foundations with job-specific equipment and technicians to assure the successful completion of all projects.

Vinyl Pool Demolition– The Process
  • Obtain a building permit
  • Licensed plumber disconnects any gas lines (for gas heated pools)
  • Licensed electrician disconnects any electrical connections to pumps and lighting in/near work areas
  • Pump out the pool
  • Remove the vinyl liner, metal or plastic sides and as much underground piping as possible
  • Breakup and remove the concrete or surrounding apron of the pool
  • Provide and install clean fill (In some towns the building inspectors will allow us to use the broken concrete as fill)
  • Compact fill in lifts to reduce any future settling
  • Provide and install 3-6 inches of premium screened loam
  • Handgrade and seed on completion
Concrete Pool Demolition – The Process
  • Obtain a building permit
  • Licensed plumber disconnects any gas lines (for gas heated pools)
  • Licensed electrician disconnects any electrical connections to pumps and lighting in/near work areas
  • Pump out pool
  • Breakup surrounding apron
  • Breakup concrete or gunite
  • Remove piping and rebar as required by the local building codes and building inspector
  • Provide and install clean fill (In some towns the building inspectors will allow us to use the broken concrete as fill)
  • Compact fill in lifts to reduce any future settling
  • Provide and install 3-6 inches of premium screened loam
  • Handgrade and seed on completion